Brennhaven Ports

Moving 14% more containers per crane, without new steel.

Result

+14%

Sector

Transport & Logistics

Practice

Operations

Duration

7 months

An operations director in a hi-vis vest talking with a consultant on a container quay

01

The challenge

Brennhaven’s main terminal was close to capacity and a new berth was six years away. Crane productivity varied by 30% between shifts, and nobody could say why.

02

What we did

We spent three weeks on the quay with crane drivers and planners, timing every move. Together we rebuilt the vessel stowage plan, changed the shift handover and gave planners a live view of yard congestion.

03

What changed

Crane moves per hour rose 14% in five months and have held for a year. The terminal handled a record peak season with no new equipment.

“

They stood on the quay at four in the morning with our drivers. That’s why the changes stuck.

— TERMINAL OPERATIONS DIRECTOR, BRENNHAVEN PORTS